• (PLX AI) – Andritz to supply hydro- and electro-mechanical equipment for 216 MW Upper Trishuli 1 hydropower plant in Nepal.
  • • Completion scheduled for 2026
  • • The Andritz scope of supply for the hydromechanical equipment includes design, engineering, manufacturing, shipping, installation, testing, and commissioning of radial gates, vertical gates, hoists, stoplogs, and penstocks
  • • The order for the electromechanical equipment comprises basic and detailed design of the turbine and generator components, complete electrical power systems, balance of plant, automation, installation, and commissioning

Quelle: PLX AI