• (PLX AI) – Vestas has secured a 50 MW order with German developer and operator of renewable energy projects, wpd AG, for three projects - Chuangwei 2, Leadway 2 and Hsinyuan wind farms in Taiwan.
  • • The Hsinyuan wind farm includes six V136-4.2 MW turbines with 112m towers
  • • Chuangwei 2 and Leadway 2 wind farms will be installed with four and two V117-4.2 MW turbines with 91.5m towers, respectively

Quelle: PLX AI