EQS-News

CIGRE 2026: Building power grids for a new age of electrification 02.09.2026, 10:05 Uhr von EQS News Jetzt kommentieren: 0

EQS-News: CIGRE / Key word(s): ESG/Miscellaneous
CIGRE 2026: Building power grids for a new age of electrification

02.09.2026 / 10:05 CET/CEST
The issuer is solely responsible for the content of this announcement.


The world is entering a new age of electricity, and the race is on to build the grids that will power it. The challenge is no longer to imagine the grid of the future. It is to build it quickly, at scale and through coordinated action across the entire electricity value chain.

This was the core message at the CIGRE 2026 Paris Session, where more than 15,000 experts from 100 countries gathered along with 330 exhibitors. 

A €600bn–a–year grid imperative

PARIS, Sept. 2, 2026 /PRNewswire/ -- Electrification of transport, industry and buildings, the integration of renewables and the surge in data–center demand are pushing power systems to their limits. To keep pace, the IEA estimates that annual electricity grid investment must increase by around 50%, from about USD 400 billion today to roughly USD 600 billion per year by 2030.

CIGRE_byline_logo_CMYK.jpg?id=OA2921097

Yet delivery times remain a major bottleneck. In China, an extra–high–voltage line can be permitted and built in about 1.5 years; in India, around three years. In Europe and the United States, similar projects often take eight to ten years or more (Source IEA).

One Grid for the energy transition

The energy transition will succeed only if the grid of tomorrow is developed, operated, and governed as one integrated system.

This "One Grid" approach requires all stakeholders to work together from the earliest stages of infrastructure planning and delivery:

  • Transmission and distribution system operators must coordinate network development and system operation.
  • Utilities, manufacturers and technology providers must scale up equipment, innovation and industrial capacity.
  • Regulators and public authorities must create stable frameworks that enable investment while ensuring affordability and public acceptance.

"No plan B, no planet B," said Konstantin O. Papailiou, President of CIGRE, calling for collective action to build the power systems of the future. 

No electrification without skills

Infrastructure and capital are not enough. The sector also faces a widening skills gap, with strong competition for engineers, technicians and digital specialists. Attracting and training qualified people is now critical for delivering electrification on time.

Around eight million people are employed worldwide in constructing, maintaining and operating power grids, but the IEA estimates that the sector will need an additional 1.5 million workers by 2030.

CIGRE is addressing this through its technical working groups and the CIGRE Fund for Innovation and Education, which supports research, scholarships and training worldwide.

Powering the future together

Invited to the FIERE (Filière Industrielle des Entreprises des Réseaux Électriques) event, Mr. Martin, the French Minister of Industry, visited the CIGRE exhibition. The Minister highlighted the importance of cooperation in delivering the current electrification wave and recalled that the first CIGRE conference was held in Paris in 1921.

More than a century later, CIGRE continues to bring together the full electricity community to address shared societal, industrial and environmental challenges.

As the world enters the new age of electricity, one conclusion stands out: one grid, one industry, one challenge—and a shared responsibility to build the power system that will enable the energy transition.

About CIGRE

CIGRE is a non-profit and independent organization established 100 years ago to support the development of electricity. With 25,000 members in over 140 countries, combining local expertise with global vision, the CIGRE community integrates all players in the electricity value chain.

It brings together researchers, engineers, suppliers, regulators, and other decision makers, all committed to sharing knowledge and collaborating to ensure a reliable, affordable and sustainable electricity supply for all.

By offering access to working groups, state-of-the-art technical publications, and world-class events such as the Paris Session, CIGRE helps its members consolidate their expertise, develop practical recommendations and find innovative solutions.

Over the years, CIGRE has continuously adapted to the incredible growth of the electricity sector. Today, as electricity penetrates every aspect of life (homes, mobility, healthcare, industry…), CIGRE meets current societal and environmental challenges, positioning itself as a key enabler of the energy transition.

More information: CIGRE Press Kit / Picture of the event / CIGRE 2026 video

Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/cigre-2026-building-power-grids-for-a-new-age-of-electrification-302865400.html

rt.gif?NewsItemId=EN37287&Transmission_Id=202609020400PR_NEWS_EURO_ND__EN37287&DateId=20260902


02.09.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
View original content: EQS News


2392626  02.09.2026 CET/CEST

Kommentare (0) ... diskutiere mit.
k.A. k.A. k.A. k.A.
k.A. k.A. k.A. k.A.
k.A. k.A. k.A. k.A.
Schreib den ersten Kommentar!

Dis­clai­mer: Die hier an­ge­bo­te­nen Bei­trä­ge die­nen aus­schließ­lich der In­for­ma­t­ion und stel­len kei­ne Kauf- bzw. Ver­kaufs­em­pfeh­lung­en dar. Sie sind we­der ex­pli­zit noch im­pli­zit als Zu­sich­er­ung ei­ner be­stim­mt­en Kurs­ent­wick­lung der ge­nan­nt­en Fi­nanz­in­stru­men­te oder als Handl­ungs­auf­for­der­ung zu ver­steh­en. Der Er­werb von Wert­pa­pier­en birgt Ri­si­ken, die zum To­tal­ver­lust des ein­ge­setz­ten Ka­pi­tals füh­ren kön­nen. Die In­for­ma­tion­en er­setz­en kei­ne, auf die in­di­vi­du­el­len Be­dür­fnis­se aus­ge­rich­te­te, fach­kun­di­ge An­la­ge­be­ra­tung. Ei­ne Haf­tung oder Ga­ran­tie für die Ak­tu­ali­tät, Rich­tig­keit, An­ge­mes­sen­heit und Vol­lständ­ig­keit der zur Ver­fü­gung ge­stel­lt­en In­for­ma­tion­en so­wie für Ver­mö­gens­schä­den wird we­der aus­drück­lich noch stil­lschwei­gend über­nom­men. Die Mar­kets In­side Me­dia GmbH hat auf die ver­öf­fent­lich­ten In­hal­te kei­ner­lei Ein­fluss und vor Ver­öf­fent­lich­ung der Bei­trä­ge kei­ne Ken­nt­nis über In­halt und Ge­gen­stand die­ser. Die Ver­öf­fent­lich­ung der na­ment­lich ge­kenn­zeich­net­en Bei­trä­ge er­folgt ei­gen­ver­ant­wort­lich durch Au­tor­en wie z.B. Gast­kom­men­ta­tor­en, Nach­richt­en­ag­en­tur­en, Un­ter­neh­men. In­fol­ge­des­sen kön­nen die In­hal­te der Bei­trä­ge auch nicht von An­la­ge­in­te­res­sen der Mar­kets In­side Me­dia GmbH und/oder sei­nen Mit­ar­bei­tern oder Or­ga­nen be­stim­mt sein. Die Gast­kom­men­ta­tor­en, Nach­rich­ten­ag­en­tur­en, Un­ter­neh­men ge­hör­en nicht der Re­dak­tion der Mar­kets In­side Me­dia GmbH an. Ihre Mei­nung­en spie­geln nicht not­wen­di­ger­wei­se die Mei­nung­en und Auf­fas­sung­en der Mar­kets In­side Me­dia GmbH und de­ren Mit­ar­bei­ter wie­der. Aus­führ­lich­er Dis­clai­mer