ANSON RESOURCES WKN: A2AC6W ISIN: AU000000ASN8 Kürzel: 9MY Forum: Aktien Thema: Hauptdiskussion

0,03105 EUR
+0,98 % +0,00030
13:53:40 Uhr, L&S Exchange
Kommentare 2.989
Di2
Di2, 07.03.2021 23:31 Uhr
0
8 March 2021 ASX ANNOUNCEMENT ASX: ASN, ASNOC Intial Novonix Battery Results Indicate Paradox Brine Lithium Products Outperform Commercial Grade Battery Highlights: • Positive results received from Novonix for both Li2CO3 & LiOH.H2O bulk sample products produced from Anson’s Paradox brine • 99.9% purity Li2CO3 electrochemical behaviour performance exceeded commercial battery grade lithium-ion batteries • LiOH.H2O demonstrated similar performance to existing commercial products • Test work included SEM/XRD analysis and electrochemical evaluation • Next stage of the testing program to measure performance in batteries at a larger scale is expected to be completed in May 2021
Di2
Di2, 07.03.2021 23:31 Uhr
0
ASN -> Battery Grade --> the best of the best😛
Di2
Di2, 07.03.2021 23:28 Uhr
0
Novonix Update😎👍
Di2
Di2, 07.03.2021 23:28 Uhr
0
Release Date: 08/03/21 09:18 Summary: Paradox Brine Li Outperforms Commercial Grade Battery Price Sensitive: Yes The announcement content will be available in 10 minutes at 09:38
Di2
Di2, 07.03.2021 20:07 Uhr
0
Seh ich auch so👍
DeSteppler
DeSteppler, 07.03.2021 14:54 Uhr
0
Und trotzdem muss man unterscheiden können ob es pump&dumb oder tatsächlich ein aufstrebendes Unternehmen ist
Di2
Di2, 07.03.2021 11:39 Uhr
0
Die eine Strategie ist es Unternehmen mit Potential frühzeitig zu identifizieren um dann eine niedrigen Absprunghöhe zu haben wenn die Rakete zündet. Die andere ist es Aufzuspringen wenn alle Karten auf dem Tisch liegen und das Unternehmen produziert. Dazwischen liegen 500-1000% Chance auf Steigerung die sich mit jedem Announcement in Richtung Produktion pulverisieren... Anson Resources ist stand heute nichts für konservative Anleger. Da müsstest du in 2-3 Jahren nochmal vorbei schauen ;)
DeSteppler
DeSteppler, 07.03.2021 3:39 Uhr
0
Haben die auch schon mal was abgebaut oder mal wieder eine... ?
Di2
Di2, 06.03.2021 9:14 Uhr
0
Falls jemand noch weiß was PEA bedeutet--> What is a preliminary economic assessment? Before a mineral resource project becomes a mine, several technical studies must be completed on a deposit to ensure its economic viability. As mentioned, putting a PEA together is one of the first steps in the process, with prefeasibility and feasibility studies following. All of these studies analyze and assess the same geological, engineering and economic factors; however, they include significantly different levels of detail and precision. For example, unlike a prefeasibility or feasibility study, PEAs may contain results of metallurgical testing that are based on an inferred mineral resource. That means the mineral resource estimate that they include may be based on limited information and sampling of the mineralization. PEAs must either be presented in the form of a technical report, or supported by a technical report. In some cases, the technical report must be independent. PEAs are sometimes called scoping studies. What’s in a preliminary economic assessment? As noted, the purpose of a PEA is to evaluate a mineral project’s economic viability. Generally, PEAs will include base case information on the capital costs associated with bringing a project into production, an estimate of how the mine will operate once it is built, how much metal and money it will produce and at what operating cost. The PEA helps mining companies understand risks and uncertainties associated with a project. The study can be part of exploration with both open-pit mining and underground mining, and should include a mine plan. More specifically, a PEA tends to have information on pre-production capital costs, life-of-mine sustaining capital, mine life and cash flow, as well as details on processing and production methods and rates
Di2
Di2, 06.03.2021 9:07 Uhr
0
Das ist für mich am spannendsten
Di2
Di2, 06.03.2021 9:07 Uhr
0
Ø The updated PEA is expected tobe completed in Q1 2021
Di2
Di2, 06.03.2021 9:05 Uhr
0
Im März sollte noch wichtige News folgen ;)
Di2
Di2, 06.03.2021 9:05 Uhr
0
Anson Resources Information taken from Dec 20 Quarterly Activities Report CORPORATE · Placement completed raising $2.4 million before costs · Anson remains well funded to meet important near-term work programs PARADOXBRINE PROJECT Key focus areas during the quarter were advancing a Pre-feasibility Study (PFS) and commissioning of performance testing of lithium hydroxide and lithium carbonate in lithium-ion battery test cells. Anson intends to use these results to further discussions with prospective offtake partners Anson has decided to accelerate the production of lithium chemicals to Stage 1 of the Project · PRELIMINARY ECONOMIC ASSESSMENT (PEA) being updated to enable accelerated Li production in Stage 1 Ø Millcreek Mining have been engaged to update the previously prepared Preliminary Economic Assessment (PEA) to incorporate a lithium processing plant in Stage 1 of the project Ø Production estimates ………? to be based upon the throughput of brine required for the 15,000tpa NaBr plant Ø The updated PEA is expected tobe completed in Q1 2021 · PRE-FEASIBILITY STUDY (PFS) Ø Following completion of the previously announced (6 & 29/06/20) PEA by Millcreek Mining, Advancedpermitting, a PFS for the Stage 1 production ofsodium bromide was progressed during the quarter Ø Worley engaged to provide engineering and design support for the PFS Ø Worley will complete the PFS forthe Stage 1 development, a 15,000tpa sodium bromide (NaBr) plant. Scope of work to include: 1. Preliminary design for the NaBr plant including Brine Pipeline 2. Chlor-alkali Plant 3. Anxillary equipment 4. Utility and supply infrastructure Expectedcompletion late Qtr 1 – early Qtr 2 2021 Ø PFS will expand upon Anson’s existing PEA to provide further definition of CAPEX/OPEX expectations of the project Ø Recent work focused on operational costings Ø Negotiations with equipment, utility and other material suppliers entered into Ø De Dietrich commissioned to produce a process design for the bromine extraction component of the 15,000tpa NaBr plant Ø De Dietrich has conducted tests on Anson’s brine, used for the extraction of bromine and conversion to sodium bromide, up to pilot plant stage This work will be completed in Q1 2021 Ø Study by Rocky Mountain Power concluded that the load service required by Anson for Stage 1 of the Project can be “accomodated” from two nearby power lines OTHERMINERALS CONTAINED IN THE BRINE Anson is also focusing its efforts at the Paradox Brine Project on the extraction of other minerals contained in the brine starting with Lithium (Li) as a precursor. PRECURSOR - a compound that participates in a chemical reaction thatproduces another compound. Lithium Hydroxide & Lithium Carbonate samples have been extracted at the Paradox Brine Project Li BATTERY PERFORMANCE TESTWORK · Anson appointed Novonix Battery Technology Solutions to test the performance of Lithium Hydroxide and Lithium Carbonate samples in Lithium-ion battery cells Ø Several kgs each of Anson’s Lithium Hydroxide and Lithium Carbonate samples will be used together with commercial battery cathode precursor materials to form NMC622 cathode powders that will be processed into lithium-ion batteries for testing · Results to be used to further discussions with prospective off-take partners. · Testing, beginning February 2021, to take 4 - 5 months BULLNICKLE COPPER-PLATINUM PROJECT · Adjoins the high-grade Julimar Ni-Cu-PGE discovery made by Chalice Gold Mines Limited (Chalice) (ASX: CHN) · Original geophysical interpretation and the initial field sampling programs have interpreted a layered intrusive complex · 3 major targets up to 1,400m in length and 800m in width identified · Initial exploration program are an airborne drone magnetic survey and a ground gravity survey to be completed early 2021 · On completion of all the surveys and further evaluation, a soil geochemical program will be planned for the Target 1 area with a view to determining the source of the strong magnetic response · Samples from the detailed rock sampling program will also be assayed for Ni-Cu-PGE’s and the data will be used to provide a more detailed understanding of the geological setting to determine possible drilling targets
Di2
Di2, 06.03.2021 9:00 Uhr
0
Kurz u. Mittelfristige Themen die den Auswärtstrend wieder herstellen können: 1. Updated PEA to include lithium production (Millcreek) 2. Results from Novonix's initial battery performance testing 3. NaBr PFS results (Worley) 4. Granting of The Bull's main exploration licence 5. Initial drilling at The Bull 5. PoO approval of re-entry program for Paradox 6. Drilling results at Paradox and impact on JORC 7. Li PFS results (Worley) 8. Financing Paradox project development
Di2
Di2, 04.03.2021 7:27 Uhr
0
Heute Nacht hat es am ASX richtig gekracht und einige Lithum Firmen sind deutlich ins rote gerutscht
Di2
Di2, 27.02.2021 23:16 Uhr
2
The main goal of the paradox basin brine project is to produce and recover valuable chemicals from a unique salt brine resource. The project will supply lithium chemicals to the rapidly growing battery market, and will produce high value byproducts including bromine, iodine and bromine. The fact that we can extract these byproducts essentially for free, is so unique and insane because it creates multiple different streams of income, mind boggling revenue numbers. Don’t forget this is only ONE of our project tenements. ASN is also advancing its other projects: - Vanadium and Uranium in the Yellow Cat Mining District. - Ajana Project ; a proven and established mining province for zinc, lead, silver and graphite. - Hooley Wells Nickel - Cobalt Laterite Project. Name me another company explorer/development that is diversified and progressed like asn, I assure you will not find one because this is truely a unique gem. Wait there’s more how can I forget the massive potential of the Bull Project right around the corner, just that ALONE could double our mc from these levels. It’s just very intriguing and exciting. The main focus at the moment is the Paradox and Bull Projects as this is the quickest path to producing, commercialising and ultimately generating massive revenues from various mineral income streams. The other projects will follow like dominos with multiple off take finance opportunities arising from exponential high demand of critical products. Still severely undervalued we are under 10c at the moment... a bit more patience will take us into the dollar range is what I envision based off my research and asn’s business model projection. Good luck to all holders
Meistdiskutiert
Thema
1 RHEINMETALL Hauptdiskussion -7,65 %
2 Plug Power ohne Spam +0,11 %
3 ATOS Hauptdiskussion -1,11 %
4 Dax Prognose ±0,00 %
5 PAYPAL Hauptdiskussion -0,16 %
6 für alle, die es ehrlich meinen beim Traden.
7 New Highland Critical Minerals Registered (A) Hauptdiskussion +61,40 %
8 Diginex -2,31 %
9 PLUG POWER Hauptdiskussion +0,11 %
10 GERRESHEIMER Hauptdiskussion +4,21 %
Alle Diskussionen
Aktien
Thema
1 RHEINMETALL Hauptdiskussion -7,65 %
2 Plug Power ohne Spam +0,11 %
3 ATOS Hauptdiskussion -1,11 %
4 PAYPAL Hauptdiskussion -0,16 %
5 New Highland Critical Minerals Registered (A) Hauptdiskussion +61,40 %
6 Diginex -2,31 %
7 ITM POWER Hauptdiskussion -1,47 %
8 Renk und alles was dazugehört -5,99 %
9 GERRESHEIMER Hauptdiskussion +4,21 %
10 PLUG POWER Hauptdiskussion +0,11 %
Alle Diskussionen