PIONEER RESOURCES Forum: Community User: Di2_1

Kommentare 1.860
W
W211, 07.02.2017 10:42 Uhr
0
Die Spread ist heftig.
B
BKM, 07.02.2017 6:56 Uhr
0
Also weiter schön billig Aktien einsammeln :)
C
Claumi1976, 07.02.2017 6:52 Uhr
0
Das geht ja schneller als ich gestern gedacht habe ;-)
B
BKM, 07.02.2017 2:20 Uhr
0
Aktuell + 11%
B
BKM, 07.02.2017 0:46 Uhr
0
DRILLING COMMENCES AT MAVIS LAKE (ONTARIO) LITHIUM PROJECT SPODUMENE PEGMATITE INTERSECTED IN FIRST HOLE Perth, Western Australia: 07 February, 2017: Pioneer Resources Limited (the "Company" or “Pioneer”) (ASX: PIO), in conjunction with its strategic partner International Lithium Corp. (“ILC”) (TSX Venture: ILC.V), is pleased to announce it has commenced its maiden drill programme at the Mavis Lake Lithium Project in the province of Ontario, Canada. Drilling at the Mavis Lake Lithium Project commenced on February 4, 2017, and the Company’s geological consultant advises that a spodumene-bearing pegmatite has been intersected early in the first hole – above the drill target depth of 120m. Drilling was postponed in December until now, due to adverse weather conditions. THE 2017 MAVIS LAKE DRILLING PROGRAMME The 2017 winter programme will comprise of up to 1,500 metres of oriented diamond core drilling and is designed to test for extensions to known spodumene-bearing pegmatites. The targets to be drilled are based on drilling by earlier explorers, including ILC in 2011 and 2012, updated with information gained from the Joint Venture’s 2016 field work, which included ground magnetometer surveys, mapping and litho-geochemical rock sampling programmes. DRILLING COMMENCED AT THE KEY PEGMATITE 6 (PEG006) TARGET Deep drilling completed in 2011 by ILC included the heavily mineralised hole MF-11-12, which returned 16m at 1.53% Li2O in spodumene from 125m plus a further 26.25m at 1.55% Li2O from 152m down hole (or approximately 100m vertically below surface). These intersections are interpreted as ‘down-dip’ from the pegmatite outcrop designated PEG006. The first drill hole of this 2017 programme, MF-17-39, and other holes are designed to test for extensions to the intersections of spodumene-in MF-11-12 and other nearby holes (see Table 1), up-dip towards the ground surface and outcrop of PEG006. At the end of the first shift drill hole MF-17-39 had intersected a narrow, approximately 2m wide, spodumene-bearing pegmatite at 48.9m, well above the targeted depth of 120m. Pegmatite 6.5 will also be drilled. It is a new target located 250m east of pegmatite 6, which was identified during the 2016 field season by its strong litho-geochemical signature. Highlight drilling intersections at PEG006 from 2011 and 2012 programmes are listed in Table 1: Table 1: Highlight Drilling Intersections from PEG006.* • MF-11-12: 16m at 1.53% Li2O from 125m • MF-11-12: 26.25m at 1.55% Li2O from 152m • MF-11-13: 5m at 1.44% Li2O from 19m • MF-11-14: 3m at 2.15% Li2O from 24m • MF-11-15: 5.35m at 1.51% Li2O from 78.4m • MF-12-24: 16.4m at 1.86% Li2O from 161.9m • MF-12-25: 5.15m at 1.75% Li2O from 130.7m • MF-12-28: 6m at 2.53% Li2O from 6m * These are drill core widths which have not been converted into true width. Appropriate rounding of Li2O values applied. FIRST DRILL HOLES INTO THE CENTRAL PEGMATITE 18 PEGMATITE Pegmatite 18 hosts high-grade spodumene, and is evident as a 200m long, arcuate outcrop. Grab samples graded up to 3.14% Li₂O1 and one composite channel sample returned 1.22% Li₂O2 over 5.3m. Initially, 6 radiating holes are planned from two locations, with additional holes planned based on the results of the earlier holes. OUTLOOK Pioneer will update the market about the progress of drilling at Mavis Lake as the programme advances. Drilling is expected to take up to 30 days to complete and assay results are expected to be available by the end of March 2017. Pioneer also plans to commence drilling at the nearby Raleigh Lithium Project in the near future, and will provide further information on the timing and details of this programme in due course. ABOUT THE MAVIS LAKE LITHIUM PROJECT The Mavis Lake Project is situated 19 kilometres east of the town of Dryden, Ontario (see Figure 1: Project Location Map). The Project is ideally situated in close vicinity to the Trans-Canada highway and railway major transportation arteries linking larger cities such as Thunder Bay, Ontario, to the southeast and Winnipeg, Manitoba, to the west. The current drill programme will be wholly funded by Pioneer as part of its earn-in on the Project (see ASX release dated 15 March, 2016). The Raleigh Project is situated 61 kilometres southeast of the Mavis Lake Project. A $1 million budget has been allocated across the Mavis and Raleigh lithium pegmatite projects, which will include a planned total of 3,000m of diamond core drilling split between the projects (See ASX release dated 26 July, 2016). Yours faithfully Managing Director For further information please contact:
C
Claumi1976, 06.02.2017 20:47 Uhr
0
Naja, wird noch dauern bis sich hier was bewegt
3
321, 02.02.2017 15:09 Uhr
0
Aber im großen und ganzen nur seitwärts.
3
321, 31.01.2017 13:39 Uhr
0
Klingt gar nicht so schlecht, oder? Geld ist immerhin noch ein bisschen vorhanden..
f
fred111, 31.01.2017 13:20 Uhr
0
Quartalsbericht http://www.asx.com.au/asxpdf/20170131/pdf/43fpr38l6yr01d.pdf Mavis Bohrungen sollen die Tage wieder aufgenommen werden. Wahren ja aushetzt da alles zugefroren war und Bohren unmöglich
3
321, 24.01.2017 17:10 Uhr
0
Ich eig auch... Hoffentlich kommt noch was.
D
Detlef2256, 19.01.2017 17:53 Uhr
0
Was ist denn mit Mavis? Hatte Ende Januar im Kopf??!!
Gastromeister1
Gastromeister1, 19.01.2017 17:38 Uhr
0
Aber es wird werden
C
Claumi1976, 17.01.2017 5:36 Uhr
0
Eben! Jetzt könnte es ruhig einwenig weitergehen
B
BKM, 15.01.2017 22:43 Uhr
0
Hoffentlich die news waren ja nicht schlecht
C
Claumi1976, 15.01.2017 22:19 Uhr
0
Mal sehen ob morgen hier Bewegung reinkommt ?
G
GM20Tab, 13.01.2017 20:19 Uhr
0
https://hotcopper.com.au/threads/ann-pioneer-dome-high-grade-caesium-and-lithium-results.3163157/?post_id=21867692#.WHkn-Z8xlyU
Mehr zu diesem Wert
Thema
1 ESSENTIAL METALS Ltd.
2 PIONEER RESOURCES Hauptdiskussion
Meistdiskutiert
Thema
1 DAX Prognose / Germany 40 +0,28 %
2 PLUG POWER Hauptdiskussion +0,69 %
3 RHEINMETALL Hauptdiskussion -1,72 %
4 DAX / Germany 40 Hauptdiskussion +0,28 %
5 VONOVIA Hauptdiskussion -0,77 %
6 IOVANCE BIOTHERAP.DL-,001 Hauptdiskussion +5,44 %
7 Gamestop, das Ende naht +6,37 %
8 Pyrum Innovations -16,86 %
9 XRP zu USD Hauptdiskussion +3,87 %
10 für alle, die es ehrlich meinen beim Traden.
Alle Diskussionen
Aktien
Thema
1 PLUG POWER Hauptdiskussion +0,66 %
2 RHEINMETALL Hauptdiskussion -1,74 %
3 VONOVIA Hauptdiskussion -0,65 %
4 IOVANCE BIOTHERAP.DL-,001 Hauptdiskussion +5,44 %
5 Pyrum Innovations -16,86 %
6 Gamestop, das Ende naht +6,42 %
7 Investmentchancen +5,91 %
8 EUROBATTERY MINERALS -9,75 %
9 Novo Nordisk nach Split -0,78 %
10 MICRON TECHNOLOGY Hauptdiskussion +5,09 %
Alle Diskussionen