ROCK TECH LITHIUM WKN: A1XF0V ISIN: CA77273P2017 Forum: Aktien Thema: Hauptdiskussion

0,4325 EUR
+0,58 % +0,0025
08:30:46 Uhr, L&S Exchange
Kommentare 61.897
O
Oldbiker, 12.08.2022 9:33 Uhr
0

@Andreito In den letzten beiden MD&As taucht das Jahr 2030 jeweils vier mal auf. Drei mal unter dem Kapitel "ESG & Sustainability". Zitat: "the Company's goal that the Georgia Lake Project will be considered best-in-class for sustainable mining in Canada by 2030" .... the Company has set the goals that by 2030, the Guben Converter (along with any other Converters which the Company may develop) will be powered entirely by locally sourced renewable energy and that 100% of the logistics in its supply chain will be CO2 neutral .... the Company has set a target of sourcing around 50% of its raw material feedstock from recycled materials from spent batteries in the production of battery-grade lithium hydroxide by 2030" Und dann noch einmal unter "Risk". Zitat: "Further, the Company makes no guarantee that it will achieve its goal of securing 50% of its required raw material feedstock from recycling by 2030." Wie kommst du da auf Produktion erst 2030 und dass man erst 2030 Geld verdienen wird? Offenbar hast du da etwas vollkommen falsch verstanden. Der Produktionsbeginn wird klar für 2024 angestrebt. Nochmal Zitat aus den beiden MD&A: "construction of the Guben Converter is expected to begin in mid-to-late 2022, with production expected to commence in 2024"

Das hab ich auch gefunden. Thx für Info
A
Andreito, 12.08.2022 9:32 Uhr
0

@Andreito In den letzten beiden MD&As taucht das Jahr 2030 jeweils vier mal auf. Drei mal unter dem Kapitel "ESG & Sustainability". Zitat: "the Company's goal that the Georgia Lake Project will be considered best-in-class for sustainable mining in Canada by 2030" .... the Company has set the goals that by 2030, the Guben Converter (along with any other Converters which the Company may develop) will be powered entirely by locally sourced renewable energy and that 100% of the logistics in its supply chain will be CO2 neutral .... the Company has set a target of sourcing around 50% of its raw material feedstock from recycled materials from spent batteries in the production of battery-grade lithium hydroxide by 2030" Und dann noch einmal unter "Risk". Zitat: "Further, the Company makes no guarantee that it will achieve its goal of securing 50% of its required raw material feedstock from recycling by 2030." Wie kommst du da auf Produktion erst 2030 und dass man erst 2030 Geld verdienen wird? Offenbar hast du da etwas vollkommen falsch verstanden. Der Produktionsbeginn wird klar für 2024 angestrebt. Nochmal Zitat aus den beiden MD&A: "construction of the Guben Converter is expected to begin in mid-to-late 2022, with production expected to commence in 2024"

Da habe ich wohl etwas missverstanden. Aber super das wenigstens einer hier sich die Mühe macht und die Berichte sich durchliest .
O
Oldbiker, 12.08.2022 9:30 Uhr
0
Nach der nächsten Woche wissen wir sicherlich mehr zur KE inkl Verwässerung und Vollzug oder nicht.
R
Rotmeskiehase, 12.08.2022 9:20 Uhr
0
Einfach Geduld haben ist hier angesagt mit etwas vertrauen und ein wenig Glück .in letzter Zeit war der Kurs ja stabil und tanzt erst seit der KE Verkündung sekündlich rum denke das fällt jedem auf .ob er nun bei 3 oder 3,50 steht ist eigentlich egal .mit Verkündung entsprechender News geht das Ding hier wohl in andere Regionen des Kurses .hab aber auch ein sl gesetzt sicher ist sicher .
O
Oldbiker, 12.08.2022 9:16 Uhr
0

Nach kurzen Suchen nur diese Aussage aus folgendem Dokument "May 24 2022 17:13:48 ET Annual information form - English" gefunden: "Based on the results of the Converter Engineering Study, the Company estimates that the Guben Converter will generate an average annual EBITDA1 of approximately U.S.$112 million between 2024 and 2043."

THX
d
docstock, 12.08.2022 9:14 Uhr
1

Im Finanzbericht oder der MD&A auf Sedar.com

Nach kurzen Suchen nur diese Aussage aus folgendem Dokument "May 24 2022 17:13:48 ET Annual information form - English" gefunden: "Based on the results of the Converter Engineering Study, the Company estimates that the Guben Converter will generate an average annual EBITDA1 of approximately U.S.$112 million between 2024 and 2043."
Orbiter1
Orbiter1, 12.08.2022 9:13 Uhr
1
@Andreito In den letzten beiden MD&As taucht das Jahr 2030 jeweils vier mal auf. Drei mal unter dem Kapitel "ESG & Sustainability". Zitat: "the Company's goal that the Georgia Lake Project will be considered best-in-class for sustainable mining in Canada by 2030" .... the Company has set the goals that by 2030, the Guben Converter (along with any other Converters which the Company may develop) will be powered entirely by locally sourced renewable energy and that 100% of the logistics in its supply chain will be CO2 neutral .... the Company has set a target of sourcing around 50% of its raw material feedstock from recycled materials from spent batteries in the production of battery-grade lithium hydroxide by 2030" Und dann noch einmal unter "Risk". Zitat: "Further, the Company makes no guarantee that it will achieve its goal of securing 50% of its required raw material feedstock from recycling by 2030." Wie kommst du da auf Produktion erst 2030 und dass man erst 2030 Geld verdienen wird? Offenbar hast du da etwas vollkommen falsch verstanden. Der Produktionsbeginn wird klar für 2024 angestrebt. Nochmal Zitat aus den beiden MD&A: "construction of the Guben Converter is expected to begin in mid-to-late 2022, with production expected to commence in 2024"
G
Gast-753021201, 12.08.2022 9:10 Uhr
1
Aber was sind dann die Beweggründe das Forum mit negativen Post zu belagern. Hier kann soviel geschrieben werden, ob pos.oder neg. - auf den Kurs wird das niemals auch nur einen cent Auswirkung haben.
O
Oldbiker, 12.08.2022 9:10 Uhr
0

In den letzten 12 Monaten lag der Schlusskurs in Kanada nur an 1 Tag niedriger als gestern. Eine denkbar ungünstige Ausgangssituation für eine Kapitalerhöhung. @Andreito Wo genau steht denn was von Produktion erst 2030? In den Präsentationen wird doch überall sowohl für die Mine als auch für den Konverter das Jahr 2024 für den Produktionsbeginn genannt.

Moin Moin, Herr Harbecke hat den Produktionsstart doch genannt. Welcher OEM geht denn jetzt einen Millionenschweren Vertrag für den Erhalt von Lithiumhydroxid ein, um das ab 2030 erst zu erhalten ? Solche Behauptungen jetzt hier zu posten ohne haltbare Beweise vorzulegen sind für mich nicht relevant. Damit unterstellt man m.E. das RTL falsche Aussagen tätigt. Ein starkes Stück.
Rombar
Rombar, 12.08.2022 9:09 Uhr
0
Wer guckt RTL ? Bloß eine Nebensächliche Frage.
Rombar
Rombar, 12.08.2022 9:08 Uhr
0
Danke für die Anmerkung und die Aufmerksamkeit Rogge. 😀👍
G
Gast-747546800, 12.08.2022 9:06 Uhr
2
Achtung, Andreito ist hier seit Monaten immer nur am negative Kommentare spamen. Da gibt es hier etliche andere, denen man bei negativen Äußerungen Beachtung schenken sollte.
d
docstock, 12.08.2022 9:02 Uhr
0

Im Finanzbericht oder der MD&A auf Sedar.com

Also in den letzten beiden MD&As finde ich dazu nichts. (02.05 und 30.05.22) Für das Jahr 2030 werden da lediglich einige Nachhaltigkeitsziele aufgestellt. Welches Dokument welchen Datums meinst du genau? Die alle durchzuklicken wäre schon recht mühsehlig.
A
Andreito, 12.08.2022 8:55 Uhr
0
Ich behaupte ja nicht das RTL es nicht schaffen kann. Die Idee finde ich gut, stehe ich auch voll hinter, allerdings hinterfrage ich einiges. RTL kann in ein paar Monaten bei 8$ oder 2$ stehen. Für mich gibt es zuviele Ungereimtheiten und vor allem weil der Wert an der TSX gelistet ist. Ein relativ unkontrollierter Markt. Und wieso lässt man alles über den kanadischen Markt laufen? Auch sehr komisch. Man hätte auch ein JV zu 100% Gründen können wenn es alleine um die Mine geht und wäre somit ein eigenständiges Unternehmen gelistet an einer deutschen Börse.
G
Gast-753021201, 12.08.2022 8:52 Uhr
0
Bist du böse ausgeknockt worden oder warum so aggro?
A
Andreito, 12.08.2022 8:50 Uhr
0

In den letzten 12 Monaten lag der Schlusskurs in Kanada nur an 1 Tag niedriger als gestern. Eine denkbar ungünstige Ausgangssituation für eine Kapitalerhöhung. @Andreito Wo genau steht denn was von Produktion erst 2030? In den Präsentationen wird doch überall sowohl für die Mine als auch für den Konverter das Jahr 2024 für den Produktionsbeginn genannt.

Im Finanzbericht oder der MD&A auf Sedar.com
Mehr zu diesem Wert
Thema
1 ROCK TECH LITHIUM Hauptdiskussion
2 Stay strong-Stay long
3 Rock tech Lithium
4 Rock Tech Lithium
5 Rock Tech ( Ohne Trolle )
6 Rock Tech Lithium Multibagger
7 Tippspiel Kurs-Stand zum 31.12.23
8 Rocktech und Mercedes
Meistdiskutiert
Thema
1 MICRON TECHNOLOGY Hauptdiskussion -4,08 %
2 Xpeng -5,64 %
3 Germany 40 / DAX Prognose -0,40 %
4 DPCM Capital Hauptdiskussion -1,85 %
5 Investmentchancen -1,70 %
6 HauptForum SK HYNIC ±0,00 %
7 Das neue Germany 40 Prognose Forum -0,40 %
8 Germany 40 Hauptdiskussion -0,40 %
9 RHEINMETALL Hauptdiskussion -0,40 %
10 Iris Energy -3,18 %
Alle Diskussionen
Aktien
Thema
1 MICRON TECHNOLOGY Hauptdiskussion -4,76 %
2 Xpeng -5,65 %
3 DPCM Capital Hauptdiskussion -1,85 %
4 Investmentchancen -1,70 %
5 HauptForum SK HYNIC ±0,00 %
6 Iris Energy -3,64 %
7 BLOOM ENERGY A Hauptdiskussion -3,10 %
8 RHEINMETALL Hauptdiskussion -0,23 %
9 EOS - Verteidigungs- und Raumfahrttechnik -7,58 %
10 SpaceX-Haupt-Hauptforum -4,01 %
Alle Diskussionen